Tel: +86-571-63258485
Product Categories
Contact Us

HANGZHOU FUYANG WANLONG MACHINERY CO., LTD

Add: No.100 Jincheng Road, Fuyang City, Hangzhou, Zhejiang Province, China

Name: Xu
            Mina Min
Tel: +86-63258485
Mobile/WhatsApp/WeChat:
            +86-18868748887   
            +86-13681798151
Email: fywljx@hotmail.com
           info@raytain.com

Web: www.epsmachinecn.com  

Email: fywljx@hotmail.com


Hot Tags: Polystyrene Expander MachinePolystyrene Shape Molding MachinePolystyrene Block Molding MachinePolystyrene Cutting MachinePolystyrene Recycling Machine

News
Home > News > Content

What Do You Need To Do Before Starting The Polystyrene Expander Machine?

What do you need to do before starting the Polystyrene Expander Machine?
Polystyrene expansion machine in the start before the need to do what preparatory work, the following we will from the following six aspects to do professional interpretation.

1. Check the oil and gas tank oil level is in the oil level gauge between the two lines, should not be added. Note that there is no pressure in the system before refueling (the oil level is less than 10 minutes after the stop), and the oil level is slightly lower during operation.
2. Make sure there is no pressure inside the system.
3. The new Polystyrene Expander Machine for the first time to start or disable for a long time and boot, you should first remove the air filter cover, from the inlet to add about 0.5 liters of lubricants, to prevent the start of the loss of oil The
4. Slightly open the bottom of the oil and gas tank drain valve, the lower part of the discharge of lubricating oil condensate and dirt, see the oil out that is closed to prevent premature deterioration of lubricating oil. The following are the same as the "
5. Check the air compressor parts are intact, the protection devices, instruments, valves, piping and joints are damaged or loose. The following are the same as the "
6. Open the exhaust valve.

Polystyrene Expander Machine in the start as long as the steps in accordance with the above steps, step by step on the inspection, operation, can do a good start and maintenance, to extend the life of the machine is very critical, usually in the course of the use Pay more attention to the details, on the one hand can make their own operating skills to enhance the other on the machine is also a very good maintenance.
It is well known that in the air compressor production practice, the pressure of the air compressor is only one of the many indicators of the air compressor. The pressure of the system is to really judge whether you are

Has a reliable, efficient and economical standard for compressed air supply. We realize that the first pressure point for the system to produce, design air compressor and system, we have a perfect product design.

Polystyrene Expander Machine design and development time to take into account your real production in every concern:
* What measures can be taken to make the system run best?
* Provide real value and empty decoration;
* Our air compressors require minimal maintenance;
* We need the lowest noise to place the air compressor at the nearest point from the gas point;
* We reduce the operating costs of the compressor by various methods;
We need to save the site area;
* We ensure long-term reliability of air compressors.